For more than three months, Azerbaijan has been preventing the accident of the only high-voltage line entering Artsakh (Nagorno-Karabakh) from Armenia in the Aghavno-Berdzor section.
In order to deepen the energy crisis, Azerbaijan regularly disrupted the works of the gas pipeline from Armenia to Artsakh. Two months have already passed since the last shutdown.
As a result, the hydroelectric power plant built on the Sarsang reservoir was the only option to alleviate the energy crisis, and an unprecedented amount of water was released from the reservoir to generate electricity during the winter.