The town of Armavir has turned into a big construction site. Yerevan Street, which is more than 2 kilometers long, is being reconstructed. With more than 750 million drams allocated from the state budget, the street is asphalted, sidewalks are leveled and repaired, water lines are changed.
The town, by the way, does not have a problem with drinking water, but due to the poor quality of the pipeline, the residents did not use the tap water for years, but, according to the residents, bought the water. The new water line will provide clean water. The quality of life of the people living in 12 residential buildings will also change.
Although the decision to dismantle the illegal structures was not made unequivocally, some of the businesses did not even wait for the labor force of the municipality, they are demolishing what they have built.
The local authorities are sure that the city will be beautified and cleaned in December. Armavir will enter 2021 completely renovated.
By Haykush Aslanyan