The RA Prime Minister Nikol Pashinyan posted a video on his Facebook page from the "Let's Build Armenia in a New Way" series. The video shows the ongoing renovation works in Armenia.
The Yerevan-Gyumri Armenian-Georgian border interstate road: 12 km of Keti-Tsoghamarg road is being repaired. Earthworks have been carried out, drainage systems have been overhauled. Two-layer asphalting will be carried out. Asphalt concrete pavement thickness is 10 cm. New plastic signal columns will be installed. The contract value is 1 billion 794 million drams. Completion of works in 2020. The road was last renovated in the 2000s.