Accompanied by the Chairman of the Council of Public TV and Radio Company of Armenia Ruben Jaghinyan and Public TV Company Executive Director Margarita Grigoryan, the President of Armenia has toured around the company facilities.
Accompanied by the Chairman of the Council of Public TV and Radio Company of Armenia Ruben Jaghinyan and Public TV Company Executive Director Margarita Grigoryan, the President of Armenia has toured around the company facilities. He familiarized with the building construction, the works conducted to improve the working conditions for the staff, and the prospects for development in the coming years. Executive Director Margarita Grigoryan has presented a brief summary of the works done, as well as their further activates.
The company’s recent main technical achievement is the mobile TV station, donated to Armenia within the framework of the annual gratuitous relief from the Chinese government. The mobile TV station is worth 3 233 735 million AMD: a new, modern TV station equipped with international standards – HD TV station including 10 cameras, and an HD satellite broadcasting station. As a result of a joint cooperation with the Chinese government, the Public TV Company of Armenia built a new equipment station in 2015, thus enabling a transition to HD broadcasting.
The HD broadcasting is available through the cable TV channel in the territory of Yerevan. It is already available in RA regions, which was launched by president’s one click on the button.
The TV Company has also been reequipped with a film dubbing studio. In order to provide a more quality process of films’ dubbing, three professional dubbing pavilions as well as audio and dubbing studio equipped with modern standards and the necessary ventilation system have been built.
The TV Company leadership prioritized the correction of the building emergency state, whatever could possibly be restored. Buildings with the 4th level of risk have been dismantled. Over the past 3 years the Company territory has been reconstructed and asphalted, with over 200 parking spaces available now. Appropriate works have been conducted to reconstruct the outdoor lighting system, as well as increase the greenery.